Quote:
Originally Posted by au3xr6
so you are saying if all engineering equations are based on BOMDAS it is still correct to use BODMAS?
|
BOMDAS or BODMAS, either or works, it is "multiplication by juxtaposition" (that is, multiplying by just putting things next to each other, rather than using the "×" sign) indicates that the juxtaposed values must be multiplied together before processing other operations, that is causing the problem, as Google and Microsoft Office (Excel) can't calculate it or with it.
Well, that is, unless my multimeter and Megger tester are faulty, which i find hard to believe as they have just come back from calibration, and my voltage drop and fault-loop impedance equations have come back to me with the same results, multiplying by juxtaposition, as what i see on my test equipment, which would be the same for you
au3xr6