|
Welcome to the Australian Ford Forums forum. You are currently viewing our boards as a guest which gives you limited access to view most discussions and inserts advertising. By joining our free community you will have access to post topics, communicate privately with other members, respond to polls, upload content and access many other special features without post based advertising banners. Registration is simple and absolutely free so please, join our community today! If you have any problems with the registration process or your account login, please contact us. Please Note: All new registrations go through a manual approval queue to keep spammers out. This is checked twice each day so there will be a delay before your registration is activated. |
|
The Pub For General Automotive Related Talk |
|
Thread Tools | Display Modes |
|
06-10-2021, 08:47 PM | #1 | ||
FF.Com.Au Hardcore
Join Date: Jul 2005
Location: Melbourne
Posts: 6,940
|
Just after some clarity on the rules (Vic) for temporary speed signs set up at road works.
My understanding is that you need to obey the temporary speed signs until the road work ends AND you see the next speed sign. But what if the road work has ended and the official road speed sign is not seen for some distance? Is there a distance limit before you can resume normal speed legally? Eastern Freeway, outbound, normally 100kmh, is getting some road works done. Its 40kmh at a small section. After the road work ends, there is no temporary speed sign to go back to 100kmh, and the next official speed sign is not seen for a good 1km or so I'd say. Its a pretty **** scenario, some cars remain at 40kmh whilst others are flying past at 100kmh. Its a difference between losing your license or not.
__________________
~~~~~~~~~~~~~~ Rides (past and present) Current: 2004 Ford Falcon 5.4L 3v Barra 220, Manual Past: Mitsubishi Sigma (m), Toyota Seca (m), Toyota Seca SX (m), Toyota Vienta V6 (m), Toyota Soarer 4L v8 (a), BA XR8 ute (m), T3 TE50 (m), BMW Z4 (m) AFF motto - If contrary views trigger, please use ignore button. |
||
06-10-2021, 09:05 PM | #2 | ||
FF.Com.Au Hardcore
Join Date: Nov 2009
Posts: 2,940
|
legally you are correct. Often the End sign is combined with a new speed limit sign but otherwise, legally you can't speed up until you do see one
in practise though you will have idiots up your **** before you've gone 50 metres so the safe option is often to speed up early similar to slowing down. Often the signs are so far before the works that you drive kms at low speed risking others rear ending you so the safe (not legal) thing to do is to wait to slow down There needs to be better management and consistency on temp roadworks signs imo. Not least to remove them when the work is complete or nobody is actively working. We do have one good set near here where it's 40mh when they are actively working but 60kmh when not reflecting the roadworks themselves are a hazard compared to the normal 80kmh limit, but also reflecting that worker safety is important when they are actually present |
||
5 users like this post: |
07-10-2021, 11:49 PM | #3 | |||
Experienced Member
Join Date: Sep 2006
Location: Australasia
Posts: 7,761
|
Quote:
|
|||
This user likes this post: |
08-10-2021, 07:20 AM | #4 | ||
RS The Faster Fords
Join Date: Feb 2014
Location: Westralia
Posts: 1,698
|
The signs aren't just there for the workers, they're left out after hours due to changed road conditions, narrow lanes, loose surfaces etc.
Just saving the numpties from themselves. If it were up too me I'd let them go and let Darwins theory prove itself.
__________________
Escort RS2000 Restored factory a/c and alloys. TD Cortina Unrestored 35 000km 6cyl manual. Mk1 GT Cortina Project. FG XR50 Daily. |
||
This user likes this post: |
08-10-2021, 09:07 AM | #5 | |||
FF.Com.Au Hardcore
Join Date: Oct 2008
Location: Victoria
Posts: 7,854
|
Quote:
but I have seen plenty of examples where the signs are out and here is no hazzard. even worse Ive encountered traffic redirect signs directing traffic though other towns adding 30mins to a Journey when the path ahead is clear.
__________________
______________________________ 2015 Territory Titanium RWD Diesel - SOLD 2016 BMW X5 xdrive 30D Msport Seadoo Challenger 210SE 310HP |
|||
06-10-2021, 09:10 PM | #6 | ||
Giddy up.
Join Date: Dec 2004
Location: Kramerica Industries.
Posts: 15,639
|
Best thing to do in this scenario is keep left or stay in the left lane (if dual lane) and let others do as they please or speed by if they feel the need to take the risk of Mr plod sitting and waiting eagerly up ahead.
|
||
2 users like this post: |
06-10-2021, 09:22 PM | #7 | ||
FF.Com.Au Hardcore
Join Date: Jul 2005
Location: Melbourne
Posts: 6,940
|
Yeh...I know what is sensible (go with the flow)...and I know what is to lose your license.
You occasionally also see signs get left out in the evenings, when there are no works going on. Either someone taking the **** or by accident. 40kmh in a 60 zone is not so bad. But 40kmh in the 100 is just crazy.
__________________
~~~~~~~~~~~~~~ Rides (past and present) Current: 2004 Ford Falcon 5.4L 3v Barra 220, Manual Past: Mitsubishi Sigma (m), Toyota Seca (m), Toyota Seca SX (m), Toyota Vienta V6 (m), Toyota Soarer 4L v8 (a), BA XR8 ute (m), T3 TE50 (m), BMW Z4 (m) AFF motto - If contrary views trigger, please use ignore button. |
||
2 users like this post: |
07-10-2021, 08:45 AM | #8 | |||
FF.Com.Au Hardcore
Join Date: Oct 2008
Location: Victoria
Posts: 7,854
|
Quote:
Funny one of the workers must have left his Holden Captiva parked there all weekend too, it had these funny spotlights on the front for spotting wildlife no doubt...
__________________
______________________________ 2015 Territory Titanium RWD Diesel - SOLD 2016 BMW X5 xdrive 30D Msport Seadoo Challenger 210SE 310HP |
|||
07-10-2021, 09:11 AM | #9 | ||||
FF.Com.Au Hardcore
Join Date: Jul 2005
Location: Melbourne
Posts: 6,940
|
Quote:
Burwood Hwy is getting some works done, during the day its 40, evenings 60, but a couple of evenings the 40s have been left out. Have seen a cop pull someone over on that stretch during the day when works were being carried out. They were sitting in front of a parked escavator, so first person that went pass and disobeyed the limit....bam.... Quote:
__________________
~~~~~~~~~~~~~~ Rides (past and present) Current: 2004 Ford Falcon 5.4L 3v Barra 220, Manual Past: Mitsubishi Sigma (m), Toyota Seca (m), Toyota Seca SX (m), Toyota Vienta V6 (m), Toyota Soarer 4L v8 (a), BA XR8 ute (m), T3 TE50 (m), BMW Z4 (m) AFF motto - If contrary views trigger, please use ignore button. |
||||
This user likes this post: |
07-10-2021, 11:54 AM | #10 | ||
Donating Member
Join Date: Mar 2007
Location: Heading thru Hell (Corner)
Posts: 8,370
|
Wish Mr and Mrs Plod would do this on the road works to the west of Sale, atm. This is work associated with finishing off the duplication of the Princes (note only one 's' for those who still pronounce it like the female version ) Highway duplication between Traralgon and Sale. The other week when I was heading in to site, they had already started excavation work of the new road base and were placing cement barriers between the current road and the new road works, so there was a 40km/h zone, which makes sense. Either side of that was a 60km/h zone. I was literally the only car doing the speed limit in that zone, with most cars passing me at around 100km/h. The State Revenue Office could have made a killing!
__________________
Labels are for jars, not for people. Life is a journey, not a destination. ~~~~~~~~~~~~~~ Daily: 2013 FGII EcoLPi in Winter White Play: 2015 FG X XR8 in Emperor Show' N Shine thread Gone, but not forgotten: 2015 SZII petrol Titanium Territory in Emperor |
||
This user likes this post: |
07-10-2021, 12:06 PM | #11 | |||
FF.Com.Au Hardcore
Join Date: Jul 2005
Location: Melbourne
Posts: 6,940
|
Quote:
__________________
~~~~~~~~~~~~~~ Rides (past and present) Current: 2004 Ford Falcon 5.4L 3v Barra 220, Manual Past: Mitsubishi Sigma (m), Toyota Seca (m), Toyota Seca SX (m), Toyota Vienta V6 (m), Toyota Soarer 4L v8 (a), BA XR8 ute (m), T3 TE50 (m), BMW Z4 (m) AFF motto - If contrary views trigger, please use ignore button. |
|||
5 users like this post: |
07-10-2021, 05:58 PM | #12 | |||
Regular Member
Join Date: Jun 2016
Posts: 107
|
Quote:
|
|||
07-10-2021, 07:51 PM | #13 | |||
FF.Com.Au Hardcore
Join Date: Jul 2012
Posts: 3,878
|
Quote:
|
|||
2 users like this post: |
09-10-2021, 01:59 PM | #14 | |||
Cabover nut
Join Date: Aug 2015
Location: Onsite Eastcoast
Posts: 11,507
|
Quote:
__________________
heritagestonemason.com/Fordlouisvillerestoration In order that the labour of centuries past may not be in vain during the centuries to come...... D. Diderot 1752
|
|||
06-10-2021, 10:17 PM | #15 | ||
Regular Member
Join Date: Jun 2016
Posts: 107
|
Often this issue is duration of works. Long term works require different tmp's (traffic management plans) to short term works. Likewise vicroads controlled roads and council controlled roads. Local gov or council roads have different tmp's to vicroads controlled roads. Setup time for the tmp depends on the length in metres or kms of the works, and the duration of the works. Where a major road upgrade on a vicroads road is happening long term works are signed (speed reduction etc) + increase or return to speed using a formula known in the trade. They leave the signs out permanently until and often after works are completed as it's quicker than setup or packup times of all the signage each day. Its also about protecting the those working in the trafficable corridor. We all know how ridiculous it is doing 40km/h at 3am with zero other cars on the road and its normally 100kmh road. What isn't known is are there workers out of sight in the median, or operating anywhere within the road reserve? Because we dont see them doesnt mean they arent there. Likewise, mobile road works of short duration use mobile attenuators as tempary mobile crash absorbing devices in conjunction with reduced speed limits. Another scenario where contractor traffic management companies may only place signage along the left hand lane of a multilane traffic corridor. Is it legal? No - vicroads require both lanes on approach to be signed as per the tmp. Picture driving along a hwy, you miss the only 40kmh sign on the left hand verge, you're driving in the right hand lane past a semi, at what you think is a legal 100kmh rd. Coupler km up the road vicpol hwy car pulls you over. Instant loss of licence for many months bc you didnt see a roadworks speed reduction sign in the left hand lane as it was obscured by a truck and there were no signs on the right hand verge. The tmp wasnt setup correctly or legally, but you still loose your license. Its not fair nor readonable. But it happens every day. Ignorance is no defence in the eyes of the law. Its crap. It fact.
|
||
3 users like this post: |
06-10-2021, 10:28 PM | #16 | ||
FF.Com.Au Hardcore
Join Date: Jul 2010
Location: NSW
Posts: 4,344
|
I believe more people would obey road work speed limits if they were more reasonable lengths. The amount of speed restrictions that start 1km+ before any hazard and finish 1km+ after the last hazard is insane.
The whole protecting you from rocks on the road is bull in many situations. Example, right now the speed limit on the NE Hwy at Ravensworth has dropped from 100 to 60 due to bridge works. The lanes have slightly narrowed so fair enough on the lower limit. But they have the low speed start well before and continue well after the bridge. It has been like this for more than I month and even though I drive past regularly I've never seen a single person anywhere near the worksite. If people are working, sure extend the speed restriction, but at 2am I don't want to be driving along slowly once I'm past the hazard. No matter what time of day it is I almost always have someone flying up behind me at 100 while I'm doing 60. |
||
4 users like this post: |
06-10-2021, 10:35 PM | #17 | ||
Regular Member
Join Date: Jun 2016
Posts: 107
|
1km before the works zone is too allow traffic to slow without causing nose to tail smashes. Not saying i agree with it. The amount of useless absent minded drivers on the road distracted be everything and anything who dont slow or drive to the conditions blah blah blah... the setup and distances and speeds are determined by vicroads if its a viceoads controlled rd. They have to allow for the lowest form of driver.
|
||
07-10-2021, 12:09 PM | #18 | ||
T3/Sprint8
Join Date: Jan 2005
Location: Australia
Posts: 16,652
|
Driving in Vic/more so Melb is like playing in the Squid Game
__________________
Tickfords T3/TS50 '02 Sprint8 manual Sept 24 '16 Daily Macan GTS "Don't believe everything you read on the internet. Abraham Lincoln" |
||
07-10-2021, 12:23 PM | #19 | ||
Experienced Member
Join Date: Sep 2006
Location: Australasia
Posts: 7,761
|
No matter what you think obey the signs otherwise cop a a fine or you could lose your licence like what happened to my mate, believe me going to court to contest it will be useless as the magistrate is bound by the law to take away your licence.
|
||
2 users like this post: |
07-10-2021, 12:40 PM | #20 | ||
FF.Com.Au Hardcore
Join Date: Jul 2005
Location: Melbourne
Posts: 6,940
|
Yep. Pretty hefty price to pay for something that may seem like an "innocent" mistake. Fine, Court costs, lawyer costs, not being able to drive, then having to deal with car insurance once you get your licence back.
__________________
~~~~~~~~~~~~~~ Rides (past and present) Current: 2004 Ford Falcon 5.4L 3v Barra 220, Manual Past: Mitsubishi Sigma (m), Toyota Seca (m), Toyota Seca SX (m), Toyota Vienta V6 (m), Toyota Soarer 4L v8 (a), BA XR8 ute (m), T3 TE50 (m), BMW Z4 (m) AFF motto - If contrary views trigger, please use ignore button. Last edited by T3rminator; 07-10-2021 at 12:45 PM. |
||
This user likes this post: |
07-10-2021, 06:08 PM | #21 | ||
Regular Member
Join Date: Jun 2016
Posts: 107
|
Yep it isnt fair nor is it reasonable. Victorian politicians have a lot to answer for when reviewing road laws and subsequent penalties.
|
||
This user likes this post: |
07-10-2021, 09:22 PM | #22 | ||
Guest
Join Date: Aug 2018
Posts: 1,892
|
My Mother In Laws car has that Speed sign recognition system. She Tells Me if there's no sign at the end of roadworks (or It's Blown over) system goes Nuts until it sees another speed sign..
|
||
This user likes this post: |
07-10-2021, 11:25 PM | #23 | ||
FF.Com.Au Hardcore
Join Date: Feb 2013
Location: Perth
Posts: 831
|
There's some long term roadworks near me on a 100kph highway. Speed has been reduced to 80kph, most people ignored it and did 100kph anyway. UNTIL the permanent speed camera was readjusted to 80kph about 4 months ago, it was flashing overtime day and night, coming the opposite way you would see it flash 4 or 5 times in the minute it took to drive past it. Took about 2 months for the cars to all be doing 80kph hahaha!!!
|
||
Thread Tools | |
Display Modes | |
|