Welcome to the Australian Ford Forums forum.

You are currently viewing our boards as a guest which gives you limited access to view most discussions and inserts advertising. By joining our free community you will have access to post topics, communicate privately with other members, respond to polls, upload content and access many other special features without post based advertising banners. Registration is simple and absolutely free so please, join our community today!

If you have any problems with the registration process or your account login, please contact us.

Please Note: All new registrations go through a manual approval queue to keep spammers out. This is checked twice each day so there will be a delay before your registration is activated.

Go Back   Australian Ford Forums > General Topics > The Pub

The Pub For General Automotive Related Talk

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 27-11-2006, 08:33 PM   #1
rag top
FF.Com.Au Hardcore
 
rag top's Avatar
 
Join Date: Dec 2004
Location: ACT
Posts: 4,028
Default ACT: 2006/7 road resealing program (where to avoid if you dont like stone chips)

Minister for Territory and Municipal Services, John Hargreaves, today (20 November) announced details of the 2006/07 asphalt overlay program.

"Asphalt resurfacing of roads in Canberra is planned to start on Monday 20 November 2006 in Wanniassa," said Mr Hargreaves.

"The asphalt overlay program, which is part of the Government's commitment to keeping our roads well maintained and safe, is particularly targeting those roads that have deteriorated as an inevitable consequence of ageing and trafiic. This is in addition to the $3.5million road resealing program announced last week.

"A contract to the value of $2.5 million has been awarded to Boral and will involve the resurfacing of a number of intersections, roundabouts, carparks and short sections of street at 26 sites.

"Asphalt resurfacing in the southside of Canberra has been programmed to be completed in late January 2007, while work on the northside areas will start in February 2007. The whole asphalt resurfacing program is expected to be complete by late April 2007.

"The summer months, when we have to roll-out our asphalt resurfacing program, are always busy. I encourage all Canberrans to drive carefully whist in and around roadworks.

"The works will be carried out during off-peak times and nights to minimise the impact on road users; however, motorists are asked to be patient with any delays when travelling through the various work sites and to utilise the detours provided.

"Signage will be erected well in advance of asphalt resurfacing works. Additionally, variable message boards will be used to warn motorists of work sites ahead," said Mr Hargreaves.

The major roads and intersections to be resurfaced as part of the program include:
· Canberra Ave / Hindmarsh Drive intersection

· Hindmarsh Dr / Athllon Dr, Botany St, Ball St and Badimara Street intersections

· Yamba Dr / Kitchener St intersection

· Drakeford Dr / Tavener St intersection

· Roundabouts on Longmore Cres at Gaunson Cres and Sainsbury Cres

· Ellenbourgh St between Crossington Smith Cres and Crossington Smith Cres

· Roundabouts on William Slim Dr at Chuculba Cres and Owen Dixon Dr

· Hobart Place, Rudd St and Darwin Place in the City

· Carparks at Section 13 and 14 in the City

· Northbourne Ave from Antill St to Wakefield Ave

rag top is offline   Reply With Quote Multi-Quote with this Post
 


Forum Jump


All times are GMT +11. The time now is 11:27 AM.


Powered by vBulletin® Version 3.8.5
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Other than what is legally copyrighted by the respective owners, this site is copyright www.fordforums.com.au
Positive SSL