Welcome to the Australian Ford Forums forum.

You are currently viewing our boards as a guest which gives you limited access to view most discussions and inserts advertising. By joining our free community you will have access to post topics, communicate privately with other members, respond to polls, upload content and access many other special features without post based advertising banners. Registration is simple and absolutely free so please, join our community today!

If you have any problems with the registration process or your account login, please contact us.

Please Note: All new registrations go through a manual approval queue to keep spammers out. This is checked twice each day so there will be a delay before your registration is activated.

Go Back   Australian Ford Forums > General Topics > Non Ford Related Community Forums > The Bar

The Bar For non Automotive Related Chat

Closed Thread
 
Thread Tools Display Modes
Old 14-08-2012, 07:06 PM   #31
steve.zissou
FF.Com.Au Hardcore
 
Join Date: Jul 2007
Posts: 609
Default Re: Attention Concreters!!!

Quote:
Originally Posted by trbo 6
A lot of people want something for nothing, people need to understand that concretors are running a business just like anyone else, they have overheads they have to pay for on top of the cost of the job regardless if it's a cash job or not. Here is a breakup of what I think the job is worth as a minimum!

8m3 concrete colour mixed inc 5% wastage = $230 x 8.4 = $1932
6 sheets mesh $60 / sheet = $420
1 Day excavator and remove soil = $800
1 day 2 men to form up $300 a day each = $600
1 day 2 men to pour = $600
0.5 day 2 men to strip formwork = $300

Total = $4,652
exactly

or
8m3 concrete colour mixed inc 5% wastage = $230 x 8.4 = $1932
6 sheets mesh $60 / sheet = $420
24 cartons of beer @$35 a case = $840
2 mates 2 days
one angry wife
total $3192
quality of finish depends of quality of your mates

(ive done about 1km of concrete drive way and have about 1 km to go)
steve.zissou is offline  
Old 14-08-2012, 07:27 PM   #32
XP6
Formerly ST170ish
 
XP6's Avatar
 
Join Date: Jan 2005
Location: Down south
Posts: 1,673
Default Re: Attention Concreters!!!

You can always tell an Aussie... labour prices are in boxes of 24
XP6 is offline  
Old 14-08-2012, 08:11 PM   #33
Ben73
FF.Com.Au Hardcore
 
Ben73's Avatar
 
Join Date: Jul 2010
Location: NSW
Posts: 4,335
Default Re: Attention Concreters!!!

My driveway is cracked and raised and all that. I want a new one, but it's about 160msq.
After seeing this thread I don't think I could get a new one for anywhere near 10 grand
Ben73 is offline  
Old 14-08-2012, 09:53 PM   #34
Shonky.
FF.Com.Au Hardcore
 
Shonky.'s Avatar
 
Join Date: Jul 2011
Posts: 4,819
Default Re: Attention Concreters!!!

Quote:
Originally Posted by trbo 6
A lot of people want something for nothing, people need to understand that concretors are running a business just like anyone else, they have overheads they have to pay for on top of the cost of the job regardless if it's a cash job or not.
Yep, plus if it rains, the concreters can't work and don't get paid.

You gotta contribute to cover this when the weathers fine.

Flash, don't be mean, pay the money or do it yourself

Last edited by Shonky.; 14-08-2012 at 10:02 PM.
Shonky. is offline  
Old 15-08-2012, 12:24 AM   #35
zilo
BANNED
 
zilo's Avatar
 
Join Date: Jul 2012
Posts: 2,886
Default Re: Attention Concreters!!!

Quote:
Originally Posted by trbo 6
A lot of people want something for nothing, people need to understand that concretors are running a business just like anyone else, they have overheads they have to pay for on top of the cost of the job regardless if it's a cash job or not. Here is a breakup of what I think the job is worth as a minimum!

8m3 concrete colour mixed inc 5% wastage = $230 x 8.4 = $1932
6 sheets mesh $60 / sheet = $420
1 Day excavator and remove soil = $800
1 day 2 men to form up $300 a day each = $600
1 day 2 men to pour = $600
0.5 day 2 men to strip formwork = $300

Total = $4,652


A whole day for two men to form up a driveway? ($600)
Half a day to remove the 4x2 formwork? ($300)

A bit rich....you could form up at 7am to 9am, concrete on site at 9 am and you could have the formwork out in 20 minutes at 5pm with the cash in your pocket and driving home....weather permitting of course.

I reckon with that in mind you could give the OP his price or close to it.
zilo is offline  
Old 15-08-2012, 03:12 PM   #36
BLUEYBA
FF.Com.Au Hardcore
 
BLUEYBA's Avatar
 
Join Date: Sep 2007
Location: Western Sydney
Posts: 746
Default Re: Attention Concreters!!!

Quote:
Originally Posted by Ugg
A whole day for two men to form up a driveway? ($600)
Half a day to remove the 4x2 formwork? ($300)

A bit rich....you could form up at 7am to 9am, concrete on site at 9 am and you could have the formwork out in 20 minutes at 5pm with the cash in your pocket and driving home....weather permitting of course.

I reckon with that in mind you could give the OP his price or close to it.

Do you have any idea of what it takes to finish concrete. Just because it poured and in place doesn't mean its finished. What if the concrete comes and its too wet, things take longer. Plus the people doing the work aren't robots and need to have a break or they will break. I've done it before and my old man has his own company and did all his life. (Italian thats all they did).
__________________
2001 Laser KQ SR
2004 BA Fairmont Ghia
2000 AUII Fairmont
1995 EF Fairmont - Tickford Enhanced
1980 ZL Fairlane in Brambles red
BLUEYBA is offline  
Old 15-08-2012, 03:25 PM   #37
anolade
trigger happy
 
Join Date: Jan 2011
Location: Victoria
Posts: 149
Default Re: Attention Concreters!!!

think it's a forum troll. no way would it be worth that little with the materials man power not 15min, going from past experice in formwork trade takes a good few hours to box up slab as well get levels set up.
could understand 3500 in pocket to concreters without cost of materials
__________________
2011 FPV GS ute Sunburst build no 202
manual leather seats car mats
376rwkw with defilipo catback Air filter CAI
enhanced by team at Blue Power Racing Developments
Now sold off and no longer owns a ford
anolade is offline  
Old 15-08-2012, 03:28 PM   #38
SpoolMan
Solution Was Boost 4?, 6 & 8
 
SpoolMan's Avatar
 
Join Date: Dec 2004
Location: Melbourne
Posts: 23,624
Chairman's Award: Chairman's Award - Issue reason: The exceptional contribution made to AFF events and sponsorship. Valued Contributor: For members whose non technical contributions are worthy of recognition. - Issue reason: Everything you do to help this place run smoothly! Technical Contributor: For members who share their technical expertise. - Issue reason: The awesome Technical and Service how to's in the FPV /XR6 /G6ET turbo threads..  and his own build threads that inspire people to have a go... enabling people to save money and realise the dream of working on their own cars as well. 
Default Re: Attention Concreters!!!

Closed, as requested by OP.
__________________
[SIGPIC][/SIGPIC]

AUTOTECH TUNED EDELEBROCK CHARGED
2017 GT Mustang Plenty of RWKW
SpoolMan is offline  
Closed Thread


Forum Jump


All times are GMT +11. The time now is 05:46 AM.


Powered by vBulletin® Version 3.8.5
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Other than what is legally copyrighted by the respective owners, this site is copyright www.fordforums.com.au
Positive SSL